Operators

print this page
TenneT

TenneT

TenneT is Europe´s first cross-border grid operator for electricity. With approximately 20,000 kilometres of (Extra) High Voltage lines and 36 million end users in the Netherlands and Germany, we rank among the top five grid operators in Europe. Our focus is to develop a north-west European energy market and to integrate renewable energy.

Taking power further.

ALPHA VENTUS

Subsea Cable Asset Name:alpha ventus
Cable Type:Power
Status of the Cable:Active
Location:North Sea
Landing Point of Export Cable:Offshore Substation “alpha ventus”; Hilgenriedersiel
Installation Date:2008
Approximate Total Cable Length (KM):63
Burial Status Upon Installation: 1.5-3m
Emergency ContactTenneT Marine Operation Center, +49 5132 89-2400

Links:

BARD OFFSHORE

Subsea Cable Asset Name:BARD Offshore 1 HVAC-Cables
Cable Type:Power
Status of the Cable:Active
Location:North Sea
Landing Point of Export Cable:Offshore Substation “BARD Offshore 1”; Converter platform “BorWin alpha”
Installation Date:2009
Approximate Total Cable Length (KM):1km
Burial Status Upon Installation: 1.5m
Emergency ContactTenneT Marine Operation Center, +49 5132 89-2400

Links:

BORKUM WEST

Subsea Cable Asset Name:Borkum West 2 HVAC-Cables
Cable Type:Power
Status of the Cable:Installed (Active in 2014)
Location:North Sea
Landing Point of Export Cable:Offshore Substation “Borkum West 2”; Converter platform “DolWin alpha”
Installation Date:2013
Approximate Total Cable Length (KM):7km
Burial Status Upon Installation: 1.5m
Emergency ContactTenneT Marine Operation Center, +49 5132 89-2400

Links:

BORWIN1

Subsea Cable Asset Name:BorWin 1
Cable Type:Power
Status of the Cable:Active
Location:North Sea
Landing Point of Export Cable:Converter platform „BorWin alpha“; Hilgenriedersiel (Germany)
Installation Date:2009
Approximate Total Cable Length (KM):127km
Burial Status Upon Installation: 1.5-5m
Emergency ContactTenneT Marine Operation Center, +49 5132 89-2400

Links:

BORWIN2

Subsea Cable Asset Name:BorWin 2
Cable Type:Power
Status of the Cable:Installed (Active in 2014)
Location:North Sea
Landing Point of Export Cable:Converter platform „BorWin beta”; Hilgenriedersiel (Germany)
Installation Date:2013
Approximate Total Cable Length (KM):129km
Burial Status Upon Installation: 1.5-5m
Emergency ContactTenneT Marine Operation Center, +49 5132 89-2400

Links:

DAN TYSK

Subsea Cable Asset Name:Dan Tysk HVAC-Cables
Cable Type:Power
Status of the Cable:Installed (Active in 2014)
Location:North Sea
Landing Point of Export Cable:Offshore Substation “Dan Tysk”; Converter platform “SylWin alpha”
Installation Date:2013
Approximate Total Cable Length (KM):10km
Burial Status Upon Installation: 1.5m
Emergency ContactTenneT Marine Operation Center, +49 5132 89-2400

Links:

DOLWIN1

Subsea Cable Asset Name:DolWin 1
Cable Type:Power
Status of the Cable:Installed (Active in 2014)
Location:North Sea
Landing Point of Export Cable:Converter platform „DolWin alpha”; Hilgenriedersiel (Germany)
Installation Date:2013
Approximate Total Cable Length (KM):76km
Burial Status Upon Installation: 1.5-5m
Emergency ContactTenneT Marine Operation Center, +49 5132 89-2400

Links:

GLOBAL TECH

Subsea Cable Asset Name:Global Tech 1 HVAC-Cables
Cable Type:Power
Status of the Cable:Installed (Active in 2014)
Location:North Sea
Landing Point of Export Cable:Offshore Substation “Global Tech 1”; Converter platform “BorWin beta”
Installation Date:2013
Approximate Total Cable Length (KM):30km
Burial Status Upon Installation: 1.5m
Emergency ContactTenneT Marine Operation Center, +49 5132 89-2400

Links:

HELWIN1

Subsea Cable Asset Name:HelWin1
Cable Type:Power
Status of the Cable:Installed (Active in 2014)
Location:North Sea
Landing Point of Export Cable:Converter platform „HelWin alpha”; Büsum (Germany)
Installation Date:2013
Approximate Total Cable Length (KM):85km
Burial Status Upon Installation: 1.5-5m
Emergency ContactTenneT Marine Operation Center, +49 5132 89-2400

Links:

MEERWIND

Subsea Cable Asset Name:Meerwind HVAC-Cables
Cable Type:Power
Status of the Cable:Installed (Active in 2014)
Location:North Sea
Landing Point of Export Cable:Offshore Substation “Meerwind”; Converter platform “HelWin alpha”
Installation Date:2013
Approximate Total Cable Length (KM):7km
Burial Status Upon Installation: 1.5m
Emergency ContactTenneT Marine Operation Center, +49 5132 89-2400

Links:

NORDSEE OST

Subsea Cable Asset Name:Nordsee Ost HVAC-Cables
Cable Type:Power
Status of the Cable:Installed (Active in 2014)
Location:North Sea
Landing Point of Export Cable:Offshore Substation “Nordsee Ost”; Converter platform “HelWin alpha”
Installation Date:2013
Approximate Total Cable Length (KM):4km
Burial Status Upon Installation: 1.5m
Emergency ContactTenneT Marine Operation Center, +49 5132 89-2400

Links:

RIFFGAT

Subsea Cable Asset Name:Riffgat
Cable Type:Power
Status of the Cable:Installed (Active in 2014)
Location:North Sea
Landing Point of Export Cable:Offshore Substation “Riffgat”; Pilsum (Germany)
Installation Date:2013
Approximate Total Cable Length (KM):48km
Burial Status Upon Installation: 1.5-3m
Emergency ContactTenneT Marine Operation Center, +49 5132 89-2400

Links:

SYLWIN1

Subsea Cable Asset Name:SylWin 1
Cable Type:Power
Status of the Cable:Installed (Active in 2014)
Location:North Sea
Landing Point of Export Cable:Converter platform „SylWin alpha”; Büsum (Germany)
Installation Date:2013
Approximate Total Cable Length (KM):160km
Burial Status Upon Installation: 1.5-5m
Emergency ContactTenneT Marine Operation Center, +49 5132 89-2400

Links:

Bulletin